~18.4 GW
Renewables online mid-2026. About 11 GW onshore, 4.3 GW offshore, 1.7 GW hydro, under 1 GW solar.
38.5 TWh
Renewable electricity generated in Scotland in 2025.
20 GW
Minimum onshore wind capacity in Scotland by 2030 (Scottish Government ambition).
~£380–394m
Recent annual wind turn-down, mostly Scottish volume. GB thermal constraints were £1.7bn in FY2024/25. Scotland was the main driver. Not a Scotland-only invoice.
~99 GW
Planning pipeline mid-2026. Roughly 30 GW offshore wind, 18 GW onshore wind, 33 GW battery.
Up to 40 GW new
Offshore wind ambition by 2040, in addition to capacity already operational or consented (Scottish Government, Jan 2026). Onshore: minimum 20 GW by 2030. Solar proposed 4–6 GW by 2030.